WomanCare, PC

This complete renovation of the Arlington Heights WomanCare office was remodeled while the tenant was in place and seeing patients. WomanCare initially occupied approximately half of this 10,000 sf space. Reconfiguration of the space, combined with all new millwork, wall covering, soffits, lighting, flooring and restroom renovations resulted in the transformation of the office into a beautiful modern space. The upgrade to the HVAC system required careful coordination with WomanCare’s patient experience, while the clean LED lighting upgrade enabled an enhanced work environment for the staff.

Status: Completed

Northwestern McCormick School Of Engineering

CDI completed the 12,600 SF build out of the Northwestern McCormick School of Engineering space located at 1007 Church St in Evanston, IL in 2023. CDI worked with the client’s designer, providing finish options that maintained the design integrity while preserving the budget. The project included repurposing elements of the existing space while providing a clean updated look.  We also added high-end features in the new training area. CDI worked with the Northwestern team to ensure they were able to utilize their space by their intended move-in date.

Gallery

Status: Completed

Equipment Depot

Equipment Depot one of the area’s largest material handling equipment suppliers needed a space to house their large inventory of machinery and parts. They found their space which included a 71,000 square foot warehouse with office space, in Romeoville, Illinois. CDI expanded the office space to include, showroom, and demonstration spaces. Essential to their show room and demonstration areas were high open ceilings and doorways to allow for movement of equipment. CDI met these requirements by installing a new black acoustic ceiling at 12’ and 10’ tall double doors. CDI installed architectural features to deliver an edgy industrial feel, including elements of acoustic baffles, hung below the ceilings and brick look acoustic panels at the upper portion of the walls.

Gallery

Status: Completed

Thales Defense and Security, Inc.

CDI completed the relocation of Thales Defense and Security, Inc’s Aurora based offices to their new 22,000 square foot space. Thales is a provider of mission critical communication technology to various government agencies. CDI worked with the client’s designer, providing finish options that maintained the design integrity while preserving the budget. The project included repurposing elements of the new space along with items relocated from their previous space. From the demonstration and conference space to the reception showcase and special lab and clean room areas, CDI provided options to keep costs down, leaving Thales with a remarkable yet functional space.

Gallery

Status: Completed

Dermatology of Central States

This 6000 s.f. project combined 2 existing spaces into one space, gutting all interior conditions and starting over. DOCS required a working space, meeting the branding of the national presence. We were able to get on board early, which resulted in no material delays and a smooth construction process. We actually had doors and frames when needed for proper sequence. All millwork was custom made, to the particular requirements of the specific operations at DOCS. The MEP work was equally complicated – all new electrical panel locations, specific power for specialty equipment, and 24 new plumbing locations.

Gallery

Status: Completed

T-Mobile

This newly completed 15,000 s.f. space was converted from raw space, and it features a combination of open ceilings, soffits with accent lighting, polished floors and quartz counter tops.  CDI worked with T-Mobile throughout the design phase, and provided multiple budgets, along with value engineering options, which helped define the final project scope.   This project also included upgrades to the building common areas, featuring new LED lighting, flooring, and updated washroom finishes.

Gallery

Status: Completed

Heritage – Crystal Clean, Inc.

We are proud to present the completion of Heritage Crystal Clean.  34000 sf of high end technical design, completed in under 16 weeks.   This project features a mixture of acoustical ceilings, open ceilings, cloud ceilings with axiom trim, archways, and converging angles.  While these elements proved to be uniquely challenging, they have prize worthy results.  The time constraints, coupled with material delays and complicated millwork installation  challenges, resulted in an unconventional sequencing of operations, which required ultimate cooperation among all trades involved.  We are proud to have had not only our PM team and supervisory personnel on site, but also CDI’s ownership involvement on a daily basis.

Gallery

Status: Completed

Datto

This 8,400 s.f. buildout was started and completed on time and on budget during the pandemic.  CDI was the leader in establishing a safe and efficient work site, with no added cost to the customer for pandemic precautions.  Weekly meetings were held virtually along with video walkthroughs and photos and video progress sent regularly to the customer.  This project included open ceilings emphasizing structural elements, polished concrete floors and quartz countertops. CDI value engineered the lighting and controls package, as well as the supplemental cooling  allowing the tenant to achieve their desired financial goals.

Gallery

Status: Completed

JUUL

Completed in 2019, this regional office for JUUL reflects a truly innovative design.  It features an open deck ceiling, a polished concrete floor, and a rework of the HVAC system to accommodate the changes between ceiling types and functionality of the space.  The elaborate millwork design for the open break area, along with the casual furniture, result in an efficient and collaborative workspace with a touch of playfulness.

Gallery

Status: Completed

1333 Butterfield – Lower Level

This project was created from a combination of mixed use spaces. We created a 10,000 s.f. building amenity center featuring a fitness center, locker rooms, a dining area, and a casual recreational area. Significant HVAC upgrades were required to complete this project, all while the building remained operational.

Gallery

Status: Completed